KSD Group, Inc., Construction Management
(925) 827-0841
620 Contra Costa Blvd, Suite 211
​Pleasant Hill, CA 94523
  • Home
  • Who We Are
    • What We Do
    • How We Do It
    • Our People
  • Experience
    • Apartments & Condominiums
    • Automobile Dealerships
    • Banking Facilities
    • Custom Estate Homes
    • Data Centers
    • Education & School
    • Golf & Hospitality
    • Industrial
    • Medical & Hospital
    • Office
    • Public Sector
    • Retail
    • Seismic & Historic Renovations
    • Single Family Subdivision
    • Theaters
  • Services
    • Predesign Planning
    • Preconstruction
    • Construction Management
    • Tenant Improvements & Facility Maintenance
    • Existing Structure Analysis
    • Lender's Control
    • Claims Resolution
    • Sustainability
  • Contact Us
  • Blog

CLAREMONT COUNTRY CLUB
Oakland, California

Claremont Country Club
KSD provided full service construction project management for the Master Plan Renovations and Additions to the turn-of-the-century 75,000 square foot country club facility, detached swimming pool, pool locker rooms and snack bar. 

Phase 1 of the project included an interior renovation of the ground floor Grille Room, Main Bar, President’s Room and adjacent foyers. Phase 1 was completed in 2006 at a cost of $814,000. Phase 2 of the project included two major additions to the existing Club House Building, an exercise facility with an outside eating terrace above, and a ladies’ lounge and locker room addition. Phase 3 of the project included demolition of the existing swimming pool and a 1950’s style pool building which were replaced with a new state-of-the-art Olympic sized swimming pool and a Tudor-style pool support building including locker rooms and a kitchen/snack bar. Phase 3 also included major improvements to the project site, hardscape and landscaping.

Working in an open book environment with Overaa Construction, General Contractor, a major value engineering effort was undertaken to remove approximately $900,000 from the budget without a negative result to the project program or architecture. To accommodate an aggressive 13-month renovation schedule, KSD worked closely with the Club management, general contractor and design team to expedite decisions and implement cost-effective solutions to construction issues. KSD reported regularly to the Country Club’s long-range planning committee with regular revisions of the Contract Cost Control, CPM Schedule and action item lists reviewed at each week’s OAC Team Meeting. Phases 2 and 3 were completed on schedule and with a refund from the contractor of $284,000 below the project GMP.


Location:
5295 Broadway Terrace, Oakland, CA
Client:
Claremont Country Club, Oakland, CA
Architect:
John Malick and Associates, Emeryville, CA 
General Contractor:
Overaa Construction, Richmond, CA
Completion:
May 2008
Constructed Value:
$11.5 Million
Photo's courtesy of:
John Malick and Associates